A wired smart home succeeds when automation is coordinated with architecture and MEP design early enough to reserve routes, panels, sensors and control points.
Coordinate before walls close
Panel locations, cable routes, sensors and network infrastructure should be resolved alongside electrical and mechanical systems.
- Allow maintainable panel capacity
- Separate power and data correctly
- Reserve routes for future systems

Keep essential functions local
Lighting, climate and shading should continue operating without the internet. Cloud access is useful for remote supervision, not as the only path to core building functions.
“”
